GK2 Layout Planner

Tier 1 Starter Factory

The first factory most players can afford: an Assembly Bench I and a Kitchen I fed from Garden Storage, with outputs into buffer chests. One carousel covers its 16 power.

Updated

Edit in Planner Open the Factory planner

1591317212529159131721 GSt C1 C1 A1 Ha Dr K1 Mi C2 C2 ZC
Underground Factory · 32×24 tiles. Green dashed tiles are open attachment slots.
Factory power (used / supplied)
16 / 28
Hammer step
Building 4
Buildings
26
Layout checks
all clear

How it works

  • A short bus leaves Garden Storage and branches through two Conveyor Chests, one per machine.
  • The Assembly Bench I takes an Auto-hammer on its small spot and a Drill Press on its large one. The Kitchen I takes a Millstone.
  • Each machine drops into its own Chest II, so a full output never blocks the other line.
  • One staffed carousel (28 power) runs all 16 belt cells with room to grow.

Buildings

Conveyor Belt×16
Conveyor Chest I×2
Conveyor Chest II×2
Assembly Bench I×1
Auto-hammer×1
Drill Press×1
Kitchen I×1
Millstone×1
Zombie Carousel×1

Bill of materials

Bronze Gear×46
Iron Detail×18
Bronze Detail×16
Fabric×16
Reinforced Plank×12
Advanced Detail×8
Wooden Beam×6
Stick×4
Wooden Joint×4
Wooden Plank×4
Iron Ingot×2
Polished Stone×2

Technologies to research

Related blueprints

GSt C1 C1 C1 C1 A1 Ha Dr A2 Ha Dr S1 Be Hm S2 Be Hm C2 K1 Mi Bio ZC ZC ZC Underground FactoryTier 1-2 Factory (Wooden & Furniture Kits + Iron Line)Chest-branched supply bus, every extension spot filled, food line tunnelled under the collector. GSt C1 C1 S1 Be Hm S2 Be Pr C2 A3 Ha La ZC ZC Underground FactoryIron & Steel Production LineSmithy I and II share one collector that feeds an Assembly Bench III. GSt C1 C1 A1 Sp Sw A2 Sp Sw C2 ZC Underground FactoryFabric Line (Spinning Wheel + Sewing Machine)Two assembly benches turning Flax from the Lifting Crane into Fabric and clothes.