GK2 Layout Planner

Supply Factory Stage 2: Clothes, Steel Tools, Wine & Beer

The second section of the community Supply Factory: tier II town supplies, the cellar’s wine and beer packed into crates, and three Bioreactors.

Layout by Freaky & Fortigan, from their community factory sheet · Updated

Edit in Planner Open the Factory planner

Mbl Ore Coal Clay Sand Stn Log Gdn Gdn Gdn Ale Bio Bio Bio K2 A1 A2 A2 K1 K1 A3 S2 A1 S2 A3 A2 S2 A2 Se Sp Sw La Be Dr C1 C1 C1 C1 C1 C1 C1 C1 C1 SS SS C1 C1 SS C1 SS SS ZP ZP ZP ZP ZP C1 SS C1 SS C1 C1 SS C1 C1 C1 C1 C1LSSSSSLLSLSLSLSSLSL
Underground Factory · the part of the factory floor this layout uses. Green dashed tiles are open extension spots; the notches on a station are its inputs, the arrow its output. Shaded floor starts broken.
Factory power (used / max)
112 / 200
Hammer step
Building 4
Buildings
138
Layout checks
all clear

How it works

  • Layout by Freaky and Fortigan, from their community factory sheet (tab “Stage2 Supply Factory”).
  • Three Bioreactors in the north; Preserves II on a Kitchen II with a Sealing Machine.
  • Two Kitchen I pack Supply: Wine and Supply: Beer from the cellar outlet in the west wall.
  • Iron Kit II and Clay Molds on Smithy II, then Supply: Cutlery II, Supply: Steel Tools, Supply: Building Materials II, Supply: Clothes I and Supply: Engineering Mechanisms.
  • One Assembly Bench II has an input facing the bench below it. That input isn’t used, so the planner lists it as a note.
  • It spreads over most of the floor, including the North-west and North sections, whose repair takes 4 Engineering Details, 4 Steel Detail and 8 Steel Screws each.
  • 112 power on the planner: 12 zombies. With stage 1 that’s 288, more than the 200 that five full carousels give, so the sheet assumes the Belt Master talent (20 power per zombie, 400 in all).

Buildings

Conveyor Belt×75
Conveyor Chest I×21
Supply Station×8
Underground Conveyor×6
Zombie Supply Porter×5
Assembly Bench II×4
Bioreactor×3
Smithy II×3
Assembly Bench I×2
Assembly Bench III×2
Kitchen I×2
Bellows×1
Drill Press×1
Kitchen II×1
Lathe×1
Sealing Machine×1
Sewing Machine×1
Spinning Wheel×1

Bill of materials

Bronze Gear×257
Bronze Detail×100
Fabric×87
Steel Screws×76
Wooden Plank×72
Iron Detail×64
Advanced Detail×54
Reinforced Beam×46
Iron Nails×44
Glass×30
Engineering Details×28
Reinforced Plank×24
Wooden Beam×18
Wooden Joint×16
Leather Scroll×4
Carved Wood×2
Iron Ingot×1

Technologies to research

Supply Factory Stage 1: Iron, Cutlery, Tools & Food Supply Factory Stage 3: Clothes II, Appliances & Furniture II Full Kit Factory (19 Stations, Every Town Kit) Kit Factory Stage 3: Tier II Kits